We are back and safe. Arrived just ahead of Hurricane Ida though we were treated to some awesome wind and seas. For those who are interested here are some notes and some FINISHED OBJECTS.
Sunday, Nov 1–left Charlotte and my two furry boys. Jake gave us the “skunk eye” from the window as we left.
On the plane I FINISHED one of Steve’s new socks. Pattern coming soon. Used Lotus Yarns cashmere sock yarn in colorway Jean.
Wait–I actually finished something before I even left. The Malabrigo Neck Thingie (pattern on Ravelry–one skein of Malabrigo). Did this after class on Saturday at the shop.
I had cast this on immediately after whining about not being able to finish anything.
We were sailing (back to the cruise) on Royal Caribbean’s Liberty of the Seas (huge). Our stateroom was very spacious and the balcony was my refuge. That’s where I FINISHED Steve’s second sock.


We do recommend the line for anyone interested.
More tomorrow.


